Client: Guangdong XX Auto Parts Manufacturing Co., Ltd.
Location: Zhaoqing, Guangdong, China
Industry: Auto parts manufacturing (stamping, CNC, assembly)
Project Type: Workshop cooling + dormitory hot water integrated solution
Completion Date: July 2026
A leading auto parts manufacturer with 800+ employees, operating a 15,000㎡ production facility including stamping workshop, CNC machining center, assembly line, and staff dormitory building. The company was facing three critical challenges:
Before:
Our Solution: 28 units of Meidebao 10HP vertical evaporative cooling industrial air conditioners
Results After 3 Months:
| Metric | Before | After | Improvement |
|---|---|---|---|
| Workshop temperature | 38-42°C | 26-29°C | -12°C average |
| Monthly electricity | $11,500 | $4,900 | -57% saving |
| Worker turnover (summer) | 22% | 8% | -64% reduction |
| Precision scrap rate | 3.2% | 1.5% | -53% reduction |
| Maintenance frequency | Monthly | Quarterly | -75% less |
Before:
Our Solution: 8 units of Meidebao 20HP commercial circulating air source heat pumps + 40-ton insulated water tank
Results After 3 Months:
| Metric | Before | After | Improvement |
|---|---|---|---|
| Monthly hot water cost | $7,800 | $1,950 | -75% saving |
| Breakdowns per year | 3-4 | 0 | 100% reliable |
| Peak hour water temp | Fluctuates 38-48°C | Stable 50°C | Consistent |
| Staff complaints/month | 15-20 | 0-2 | -90% reduction |
| Item | Annual Cost Before | Annual Cost After | Annual Saving |
|---|---|---|---|
| Workshop cooling | $138,000 | $58,800 | $79,200 |
| Dormitory hot water | $93,600 | $23,400 | $70,200 |
| Maintenance & repairs | $18,000 | $5,000 | $13,000 |
| Total | $249,600 | $87,200 | $162,400 |
Total project investment: $318,000
Annual savings: $162,400
Investment payback period: 1.96 years
Estimated 10-year total savings: $1,306,000
"We evaluated five different suppliers before choosing Meidebao. What sold us was their ability to handle both our cooling and hot water needs with one integrated solution. The results have exceeded our expectations — we're saving over $13,000 every month, and our workers are much happier. The payback will be even faster than they projected."
— Factory General Manager